How It Works:
Measure → Fix → Install
You'll know what's leaking per shift, what's causing it, and what the next step is.
No prep deck. Just labor, output, downtime.
MARGIN RECOVERY FIRST. LEAN DEPLOYMENT SECOND.
The 20-Minute Exposure Call
Before anything goes on-site, I spend 20 minutes with you to confirm fit, estimate exposure, and decide if Phase 1 makes sense.
- Confirm fit — size, environment, urgency
- NDA available before any data exchange
- You share basic numbers: labor, output, downtime, overtime
- I estimate rough exposure with you live on the call
- If it makes sense, I schedule Phase 1 dates
From first call to installed system.
No Ambiguity. Three Steps.
Measure
Time-stamps + throughput behavior + your labor and production data → exposure in dollars.
Fix
Constraint first. 1–2 outcomes only.
I stabilize the bottleneck and remove the friction reducing output.
Install
Leader routines + scorecards + escalation rules.
The 2-Day Margin Diagnostic
Two days on your floor. No prep deck required. Here's exactly what happens.
If you can show me headcount, output, downtime, and overtime, I can do the math.
- I walk the flow end-to-end across active stations
- I time-stamp delays — people, machines, material waiting
- I identify the constraint and confirm with WIP behavior
- I validate throughput patterns against production targets
- I confirm findings with your labor and downtime data
- I quantify per-shift leakage in dollars
- I build a prioritized recovery roadmap by financial impact
- I deliver an executive readout — findings + next steps
- Per-shift dollar leakage estimate (with assumptions sheet)
- Prioritized recovery roadmap ranked by financial impact
- Executive-ready slide deck
- 30/60/90 day action plan
- Finance-ready math: assumptions + sensitivity ranges
If You Stop After Phase 1
Phase 1 stands alone. You're not committed to anything beyond it.
- Leakage math — per shift and annualized
- Prioritized recovery roadmap
- 30/60/90 day action plan
You can execute internally with your team, or bring me back for Phase 2 when you're ready. There's no expiration on the roadmap.
How Disruptive Is This?
- Observation-first — I'm not stopping lines
- I work around your production schedule
- Data requests are minimal and handled off-floor
- I'm measuring how work actually moves — not running meetings
Rapid Operational Correction (4–8 Weeks)
Scope locked from Phase 1 findings. 1–2 outcomes only. Constraint first.
- Constraint stabilized and protected
- Flow friction and backup points removed
- Downtime reduced through root-cause corrections
- Labor aligned to actual demand across the shift
- Scope locked from Phase 1 findings
- 1–2 outcomes — no scope creep
- Weekly cadence + scorecard agreed upfront
- Before/after metrics tracked throughout
System Installation (6–12 Months)
Margin is recovered. Now I make sure it stays recovered.
- Tiered daily management system (Tier 1–3)
- KPI scorecards + operating cadence
- Escalation rules
- Standard work for 5–10 critical processes
- Leader training routines
- Gains fading after engagement ends
- Leaders reverting to reactive firefighting
- Constraint drifting back without visibility
- No single person holding the floor together
The Measurement Checklist
- Paid labor minutes not producing output
- Constraint starvation and blockage patterns
- Changeover loss and schedule adherence
- Constraint utilization vs. planned
- WIP stacking patterns
- Overtime drivers and rework loops
FAQs
I guarantee the process: measurement, clarity, deliverables, and cadence.
No fluff. No endless decks. Just measurement, fixes, and cadence.
I don't guarantee a specific dollar amount — that depends on access, baseline stability, and execution speed.
Know What's Leaking
Before the Next Shift.
20-minute call. I estimate exposure from your labor, output, and downtime numbers.
If you're not a fit, I'll tell you on the call.